What’s New in Brookfield
What’s New in the Town of Brookfield? A groundbreaking ceremony was held on June 27th at the former Hearth Restaurant to celebrate the start of the Phase 2 portion of the Brookfield Streetscape project.  The second phase is an extension of Phase 1 and includes the following:
–  A sidewalk on both sides of Federal Road, running south from the end of Phase 1 construction to the intersection of Old Route 7.
– A mid-block crosswalk connecting the Still River Greenway Trail to the sidewalk and bike path
– Parallel parking on the street, shrubs and trees along the new sidewalk.

The connection to the Still River Greenway trail will provide foot and bike access from the trail to Brookfield Village for dining and shopping.  Coinciding with phase 2, design has begun on a separate project funded totally by a state grant.  A 2,500-foot extension of the greenway will connect the path to the parking lot near the firehouse by Town Hall.
————————————————————————————————————–
A Request from the Still River Greenway Ad-Hoc Committee

We are an Ad Hoc Brookfield volunteer committee determining the feasibility of extending the Still River Greenway (SRG) north to the New Milford Town Line.  By completing this survey, we will understand better who and how the SRG is currently being used by the community. Please take this 3 minute survey here. The Greenway Extension is currently in the design review stages.
For more information on the Still River Greenway please contact Parks and Recreation at (203) 775- 7310

What’s New in Brookfield

What's New in the Town of Brookfield? A groundbreaking ceremony was held on June 27th at the former Hearth Restaurant to celebrate the start of the Phase 2 portion of the Brookfield Streetscape project.  The second phase is an extension of Phase 1 and includes the following:
-  A sidewalk on both sides of Federal Road, running south from the end of Phase 1 construction to the intersection of Old Route 7.
- A mid-block crosswalk connecting the Still River Greenway Trail to the sidewalk and bike path
- Parallel parking on the street, shrubs and trees along the new sidewalk.

The connection to the Still River Greenway trail will provide foot and bike access from the trail to Brookfield Village for dining and shopping.  Coinciding with phase 2, design has begun on a separate project funded totally by a state grant.  A 2,500-foot extension of the greenway will connect the path to the parking lot near the firehouse by Town Hall.
--------------------------------------------------------------------------------------------------------------
A Request from the Still River Greenway Ad-Hoc Committee

We are an Ad Hoc Brookfield volunteer committee determining the feasibility of extending the Still River Greenway (SRG) north to the New Milford Town Line.  By completing this survey, we will understand better who and how the SRG is currently being used by the community. Please take this 3 minute survey here. The Greenway Extension is currently in the design review stages.
For more information on the Still River Greenway please contact Parks and Recreation at (203) 775- 7310


Valid: 01/01/1970 - 01/01/1970